Wednesday, 3 June 2015

WEEK 2 (FYP 2)

Week 2


During this week,  going to book the lab of power electronic to monitor the starting current of the power windows motor.

Equipment used
  1. power analyzer

The above picture is the devised that is used to analysed the power for any devised, its also can analysed the harmonic distortion.



during the lab season i ask for the technician, he sad the devised cannot measured and recorded the real time of the starting current because its happen too fast about in mili second


therefore the objective of the experiment is not success.



WEEK 1 (FYP 2)

Week 1

Title of Activity : Meet the supervisor  (Discuss about the project)

Objective :
To discuss with the supervisor about the expected activity schedule for each week in this semester

Planing for booking lab to investigate the starting current of the motor



 
As we know, my Final Year Project's title is Colour Detector For the Colourblind People. For the introduction, let's we take a look briefly about my project. Before that, for the S1'12 the assesment for Final Year Project semester 2 is as below :

                                     Demo                     20%
                                     Report                   20%
                                     Blog                        15%
                                     Technical Paper  5%
                                  ............................................  
                                     TOTAL                  60%
                                  ............................................

FYP 2 LOG BOOK


       DEVELOPMENT OF POWER WINDOW SAFETY                                         SYSTEM  

Universiti Kuala Lumpur British Malaysian Institude

Name:  Abdul Salam Bin Abu Sapian
Matrix No : 51210212330
H/P019-4497921
Supervisor : Ismail Bin Adam

Friday, 5 December 2014

WEEK 12

Preparation for project proposal

this week all student need to submit the project Proposal




Friday, 28 November 2014

WEEK 12

Presentation Week.
 This week All the student need to present their project.

On 3.00 p.m wednesday (week 12), all FYP1 student have to present their proposal of proposed project. Each student are access by two assessor randomly. I has been assess by Sir MUHYI YAAKOB and AZMAN B. ABDUL AZIZ @ YUSOF from electronic section. Alhamdulillah everything was fine and the presentation run smoothly. 



















LECTURER :MUHYI YAAKOB

M.Sc in Mechatronics Eng (UniMAP, 2011)
B.Eng (hons) in Mechatronics Eng (UniMAP, 2008)
Specialization:Electronics - Embedded Systems
Sub-specialization:Embedded Microprocessor,Microcontrollers & Interfacing,Digital Signal Processing,Fuzzy Logic Control
muhyi@unikl.edu.my 03 -6184 1000 ext  146












LECTURER: AZMAN B. ABDUL AZIZ @ YUSOF

B.Eng (Electrical & Electronics), Univ. of Hertfordshire, UK (1998)
03 -6184 1000 ext 236






Friday, 14 November 2014

WEEK 10


Preparation for the presentation.

not much i do during this week, i just make the slide show to convenient all lectures so that this project can be successful for the next semester.











Friday, 7 November 2014

WEEK 9


finding the suitable current transducer.

to measured current of the motor i used this type of transducer name LTS25.


the operation principle is the wire is need to be put inside the hole of the transducer and its will measured the current trough the wire and give an output value in voltage and can be read bu MCU through the analog to digital converter. and this transducer is only need 5 volt to active the transducer.

 the datasheet can be get at http://www.alldatasheet.com/datasheet-pdf/pdf/172078/LEM/LTS25-NP.html